Clothing from design to the production process

According to the time band, the designer plans the color, style, style matching, matching effect, main surface and accessories, patterns and patterns, etc. After completing the design, make the proofing sheet (style diagram, surface and accessories information, printing/embroidery drawings, dimensions, etc.) And send it to the production department. According to the style category, the production manager arranges the inspection, procurement and sewing of fabrics and accessories. The following points should be paid attention to :

(1) whether the position of the buttonhole is correct. 

(2) Whether the buttonhole size matches the button size and thickness. 

(3) Whether the buttonhole opening is cut well. 

(4) For stretchable (elastic) or very thin material, consider adding fabric to the inner layer when using keyhole. 

The stitching of buttons should correspond to the position of the buttonhole, otherwise it will cause distortion and skew of the garment because the buttonhole is not allowed. When stitching, attention should also be paid to whether the amount and strength of the stitching line is enough to prevent the button from falling off, and whether the number of stitching on the thick fabric clothing is sufficient; then iron it. Ironing is an important process in garment processing. Pay attention to avoid the following phenomena :

(1) due to the ironing temperature is too high for too long, resulting in the aurora and scorching phenomenon on the garment surface. 

(2) Small wrinkles and wrinkles are left on the garment surface. 

(3) There is leakage and ironing part. 

After finishing the first version of the sample clothes, the fitting model will wear the sample clothes (some companies do not have real models, human table), the designer will look at the sample, determine where the version and process details need to be modified, and give the modification opinions, the sample clothes will be modified twice. Sent to the customer, after the completion of the second version of the sample as sample, confirm version, fabirc, technical details, not matter too many clothes, determine whether to place an order, the designer to confirm bulk pp samples, big goods in accordance with the delivery done, will provide a large sample, and then QC checks goods, also deal with the finished product before delivery to conduct a comprehensive inspection, to ensure the quality of the products. The main contents of finished product inspection are :

(1) whether the style is the same as the confirmed sample. 

(2) Whether the size and specifications meets  the requirements of the process sheet and sample clothes. 

(3) Whether the stitching is correct, whether the sewing is regular and flat. 

(4) Check whether the pair of lattice fabric is correct. 

(5) Whether the fabric thread is correct, whether there are defects and oil stains on the fabric. 

(6) Whether there is a color different problem in the same garment. 

(7) whether the ironing is good. 

(8) whether the adhesive lining is firm, whether there is glue infiltration phenomenon. 

(9) Whether the thread has been repaired. 

(10) Whether the garment accessories are complete. 

(11) Whether the size mark, washing mark and trademark on the garment is consistent with the actual contents of the goods and whether the position is correct. 

(12) Whether the overall shape of the garment is good. 

(13) Whether the packaging meets the requirements. Finally confirm no problem before packing and shipping.


Post time: Oct-08-2022